China new opportunities, electric car charging field

On September 15, In Guangdong Province Development and Reform Commission witness, Guangdong Province Electric Vehicle Charging Infrastructure Promotion Alliance (hereinafter referred to as "Union") held the first meeting of members, Election to the relevant regulatory agencies, Marking the alliance into the substantive operation. At the same time, Guangdong charging facilities intelligent service platform unveiled mystery, The platform consists of "Guangdong easy charging", "Guangdong easy charging" portal and intelligent monitoring system. APP,As of September 14, the platform has access to 18 charging facilities operators, Charging station 1819, charging pile 13438, To meet the province's 1/5 of the electric vehicle users at the same time online charging, With more operators to join, this data is still rising.

Build new energy automotive industry 100 billion "blue ocean"

The industry believes that electric vehicles and charging facilities there is a clear symbiotic relationship. At present, the development of charging facilities and electric vehicles in Guangdong Province is not yet coordinated, On the one hand, the size and density of charging facilities still can't meet the basic requirements of electric vehicle travel, construction constraints are more difficult to coordinate; On the other hand, charging facilities technology development "has been on the road", did not explore a mature business model.

The establishment of the alliance, to Solve the above problems. It is understood that, The alliance consists of energy suppliers, charging facilities manufacturers, charging operators, third-party organizations and related organizations, Will form a joint force, the activation of public goods, public services "twin engine" to jointly promote the development of the industry. Elected by the first general meeting of the Union, Guangdong Power Grid Corporation and the Guangdong Provincial Communications Group, respectively, as the Union's chairman and vice chairman, Relying on the advantages of power grid and transportation network, Open up the key points of the construction of charging facilities. At the same time, The Alliance has a technical co-ordinating committee, Charging Facilities Standards Implementation Promotion Committee, Charging operations service synergy committee, Network intelligence information And the Statistical Commission, Study and formulate charging facilities standards, Promote relevant technical chain perfection and unimpeded, Promote standardization and large-scale development of charging service, Charging facilities interconnection, Effectively promote the electric vehicle charging infrastructure benign development. It is estimated that 2016 to 2020, The province's total investment in charging facilities construction is about RMB54 billion, Is expected to drive power battery output value of about RMB42 billion, Electric car output value of about RMB220 billion, Build a veritable hundred billion "blue ocean".

Achieve a single charging facilities interconnection

The existing charging pile has the problem of low utilization ratio. They are in the province's 16 prefecture-level city layout of the 13702 charge pile, The highest utilization rates are mainly in the main urban areas of Guangzhou and Huizhou, Charging facilities operator Lee manager said, "Where the utilization rate is lowest ,On-line 26 months charge only 4.6 kwh." Due to charging the old and new agreement is not uniform, Charging operators are many and scattered, and there is "information difference" between operators and users",Resulting in the storage of charging piles independently into one ,Electric cars can't find the main pile, or found a pile can't be used, This is the status of each other fragmented lead to a lot of charging pile from the built on in the idle state.

Commissioned by the Guangdong provincial development and reform commission, Guangdong Power Grid Corporation is responsible for the development and construction of the "Guangdong easy charge" APP to achieve the interconnection of charging pile. Horizontally , To provide users with different charging operators choice, Users in the province's 21 prefecture level cities can find more than one available charging pile. Vertically, "Guangdong easy charge" to provide users with one-stop "one-button" service, That is, a key to find a pile, a key navigation, a key charge, a key to pay, Users can search the nearest, You can also search the specified operator vertically.

In addition, Intelligent monitoring system dig deep "charging large data" connotation, Support data open sharing, The realization of the charging facilities construction layout analysis, station operation analysis, user behavior analysis, service radius analysis, access data verification, subsidy application and other functions, For government decision-making and supervision to provide effective data support.

Guangdong will build a " one longitudinal, one horizontal, two radiation"

It is reported that, To crack the electric car owners "mileage anxiety".

To the "thirteen five" end,The province will be based on the highway network, strengthening the interconnection of charging infrastructure, Completion of the Pearl River Delta loop high-speed G94, Shenhai Guangzhou branch line S15, Guangao Expressway G4W, Guanghui Expressway S21,Guanfo Expressway G94 (11) Service area intercity fast charge station construction, To achieve the Pearl River Delta loop charging network through.

Simultaneously, Open up the province "big artery" Completion of Jinggangao high-speed G4(Shaoguan - Guangzhou - Zhuhai), Shenhai high-speed G15(Chaozhou - Guangzhou - Zhanjiang), Guang - kun high-speed G80(Guangzhou - Yunfu), Long deep high-speed G25 (Shenzhen - Meizhou) Service area charging network full coverage construction, To achieve the Guangdong region " one longitudinal, one horizontal, two radiation " high-speed trunk charging network through, The charging network connects the cities and the surrounding provinces.

In addition, in order to further strengthen the interconnection with Hong Kong and Macao, Guangdong power grid company plans to invest about 90 million yuan to build Hong Kong-Zhuhai-Macao Bridge artificial island charging demonstration projects, 550 charging piles are built, Fully consider the Hong Kong-Zhuhai-Macao three electric vehicle standards, Planned in the artificial island of the traffic center, travel inspection area A, for the bus, long distance bus, tourist bus and clearance bus and electric taxi, To provide three vehicles GM, fast charge-based charging facilities. Which 360 kW DC fast charge device can achieve 6-10 minutes fast charge, battery life 80 km.

Distributed power on-gird service in China

China State Grid Corporation recently publish <Comments of the distributed power on-gird service>, following the support of distributed photovoltaic grid, the State Grid Corporation will support be extended to wind power, natural gas and other types of distributed power. Various provinces and cities have introduced a specific mode of operation guide.


Definition of distributed power is located near the user, the power can place the use of grid voltage level of 10 kV and below, single and outlets does not exceed the total installed capacity of 6 MW power generation project. Including the type of solar energy, natural gas, biomass, wind energy, geothermal energy, ocean energy, resources comprehensive utilization of power generation.


In terms of price settlement, distributed power grid to the implementation of the upload, download charge separate settlement, tariff implementation of relevant national policies. Distributed photovoltaic power generation, wind power project, the company is free to provide the gateway metering device and the measurement electricity generating capacity.


China Government plans in 2015 to build 1000 natural gas distributed energy projects, 10 natural gas distributed energy demonstration area; distributed solar power generation will reach 10 million kilowatts, the new energy model city built 100-based distributed renewable energy applications.


Expected spurt in the future for the distributed power of individual users bidirectional energy measurement instrument, Blue Jay Electronic will seize this opportunity, in existing small metering equipment technology, and integrate the Internet of Things technology, to publish a new measurement products. The main target customers are small businesses and house users, can be able to do measurement, data analysis, monitoring of energy storage devices integrated monitoring functions products.

MRR-E configuration guide

Thanks for chosen Blue Jay Technology products MICO-RACEA wireless temperature monitor system, it designed as a flexible networking equipment, user can easy build wireless monitor network, multi-channel auto frequency-hopping technology to avoid interference from other wireless devices, especially suit for variety of commercial and industrial environments.
 
Blue Jay Technology also provide free Cloud Server for every client test.
 
Cloud server provide following function:
1. MRS sensor data display & record;
2. Remote change MRS upload interval & alarm trigger;
3. Every MRS sensor max 10000 lists record data.
 
Notes: Blue Jay provide free account for max 10 MRS sensor, 1 MRR receiver connect, 6 month validity after order.

How to use Blue Jay Cloud Server

-----------------------------------------------------------------------------------------------------------------------------
 
This guide is for every client know how to use MICO-RACE, and run test software [Microtemp Desktop]on your PC.
 
We will use following software:
 
1. Ethernet port configuration software TCP232-T24 V5.1.0.1 [Download
2. MTD-ver1.0 for temp data display [Download
Now please follow the guide steps to use the MICO-RACE:

---------------------------------------------------------------------------------------------------------------

Part I. Use [TCP232-T24] for Ethernet Port configuration in MRR-E
 
---------------------------------------------------------------------------------------------------------------

Step 1: Connect the MRR-E to the Ethernet Router and power ON, please make sure your PC in same network.
 
Step 2: Run [USR-TCP232-T24 V5.1.0.1.exe] in your PC
 
you will see the software interface, press button [Search in LAN], software will auto scan your network to find MRR-E device, you will see it shown in right box:

Step 3: Double click the searched device can read the configuration parameters in left chart:
 
Step 4: Please change the following configuration:
 
Module IP: Assign the MRR-E device IP to any one you like in your sub-network, do not duplicate existing equipment, otherwise there will be a network error.
Default Gateway: Change Gateway IP that matched with your network setting.
Destination IP: Change the IP that direction to your PC that run [Microtemp Desktop.exe]If you plan connect to Blue Jay Cloud Server. please config this IP is (60.191.205.75)
Destination Port: Default is 16254, if change to other port, that in [Microtemp Desktop.exe] need config "TCP terminal" same with this number.
If you plan connect to Blue Jay Cloud Server, Please find your own Server Port and account info in products package, or contact your sale manager This email address is being protected from spambots. You need JavaScript enabled to view it.

NotesPlease do not change other parameter in Ethernet Port, or MRR-E may unable to work.
 
Step5: Press button [Set selected item via LAN] to end the Set

---------------------------------------------------------------------------------------------------------------------------------------- 

Part II. Run [Microtemp Desktop] to show temperature data from MRS in your PC
 
----------------------------------------------------------------------------------------------------------------------------------------

Step 1: Port scan configuration

Choose [Comm Config] button, software will automatic detect LAN IP of your PC and show in the dialog window, please make sure the IP same as preset "Destination IP", confirm the TCP terminal is same as MRR-E Ethernet port presetting (default is 16254).


Step 2: Create the MRS sensor display window

Press button [Add MRS], In MRS sensor information box enter:
 
Sensor_ID: 8 digital in HEX, you can find it on the MRS body.
MRS Type: Select correct MRS type, if you do not clear, please contact our sales team..

After setting press button [OK] for confirm and exit; then redo the step 2 until all the MRS window had created in software.
 

Step 3: Press button [Run] for start scan TCP/IP port, then you can see the MRS window display temperature data.
 

Click [RUN] in toolbar, then switch to "Raw_data" page, you should see a upload command, it contain MRR ID inside, mean connection success. Otherwise, the connection is unsuccessful.


Step 4: Read & Change MRS parameter
 

In "Curve" page, click each MRS line, you can see record curve drawn by latest 10 record point. also you can see the "Basic Config" table in the right part of screen. detail of each parameter please refer to the " Mico Race Data Format_1.6"
 
Notes: Do not configure advanced parameters without Blue Jay technical support, or MRS sensor will not work!!

in example show setting of MRS (000075B6):
 
Choose any parameter you want to know in 000075B6, press Read, you can see the data in "value" column; Double-click column can input the setting value, then press Set. 
 
In configuration operation, after set one MRS, you can switch to the "Raw_Data" screen to see detail data flow, that can easy help test engineer understand MICO-RACE protocol.
 

 
-------------------------------------------------------------------------

Other function:
 
1. Save MRS list, click [Save] on tool bar, you can save the MRS list in software. Next time you can press [Open] to load the MRS list and continue work.
2. Cancel MRS in your list, select the MRS you want to delete. (need switch to "Curve" page), Click Cancel MRS on the toolbar.
3. MRS record value, Software will record the latest 100 data in "History" page for each listed MRS, you can press [Export] on toolbar to save the record data in Excel file.

How to use Blue Jay Cloud Server

Blue Jay Technology provide Cloud Server for test, Cloud Server provide following function:
 
1. MRS sensor data display & record;
2. Remote change MRS upload interval & alarm trigger;
3. Every MRS sensor max 10000 lists record data.
 
Every client purchase MICO-RACE will have a independent test account and TCP port. only for destination the MRR-E or MRR-M to Cloud Server:
 
Destination IP: 106.75.224.56
Destination Port: 30XXX (It can be find in products package or contact your sales manager)
 
I have MRR-E, MRR-E configuration guide
I have MRR-M, MRR-M configuration guide
 
Then open your Web Browser
 
Open the site: MICO-RACE cloud

Enter user Name and Password (default password is 000000, please change the password in your first access)
 
Blue Jay provide test account for every client:
 
Account Name: This email address is being protected from spambots. You need JavaScript enabled to view it.
Password: 000000


----------------------------------------------------------- 

Description of main screen:
 
In Main screen user can check all the temperature/humidity data detect from MRS sensors, there have a warning bar to display how many MRS working abnormal.
 
If MRS trigs upper / lower limit alarm, the data will display in red or green color.
 
Also free to edit some MRS in one group, that easy for large quantities of MRS display

Click one MRS display window for enter MRS detail record
 
-----------------------------------------------------------

Description of MRS detail info screen:
 
Cloud Server will auto display recent 10 lists record data, and drawing a record curve. If want check more record data, select “Start Time” and “End Time” in [History Data] box, press button [Query] for display all record data during the select time period.
 
Press button [Export to xls] or [Export to txt] can download the record data in select time period.
 
Press button [Rename] that user can free to change the MRS name as prefer, and in Main screen MRS will show the changed name. (MRS default name is sensor ID)

-------------------------------------------------------------
Description of MRS configuration screen
 
MICO-RACE system provides data upper / lower limit alarm function. That MRS detect temp or humidity raise or decline to the preset trig value, will send alarm info immediately, Blue Jay Cloud Server can display and record this info.
 
User can free to configuration alarm value as application or project needs. Also can free to change the MRS auto upload data interval, the minimum interval is 1min.
 
Notes: Blue Jay Tech Team suggests time interval is 5min/10 min/20min in normal environment monitor, because change of temperature and humidity in environment is a slow process. If need smaller data upload interval, that battery life will reduce a lot, please contact our tech team for more support: This email address is being protected from spambots. You need JavaScript enabled to view it.

Notes: Blue Jay Cloud Server designed has alarm push via SMS and E-mail, but in test account the function is closed, only for ODM clients and agents’ clients.
 
Want to be our agents? Download this form and send to Blue Jay Sales Team for more details: This email address is being protected from spambots. You need JavaScript enabled to view it.

MRR-M configuration guide

MRR-M is special designed for MICO-RACE system; integrate MRR-R and GPRS router inside together in one device, provide none-wiring usage. It can works with 12V rechargeable battery that easy built Mobile type MICO-RACE data transmitter. The GPRS router support 850/900/1800/1900Mhz GSM network (Default work in 900/1800Mhz).
 
Notes: 
 
1. Antenna have different sharp, depends one client requirement, all use standard SMA port, if antenna damaged or dissatisfied with signal performance, users can change higher gain antenna with same specification and port.
 
2. Aux power support standard 12V AC-DC adapter or battery, if power less than 6V MRR-M may work abnormal.
 
MRR-M communication port is RS232, you can use any type of RS232 adapter to connect host PC, Blue Jay provide DT-500X type RS232 to USB adapter, click here to know more
 
Also need GPRS router configuration software DTU-RTU tool.exe [Download
Every MRR-M was pre-configuration to send data to Blue Jay Cloud Server www.microtemper.com, if you want send data to other IP, please follow this guide:
 
Step 1: Set PID switch for GSM configuration
 
Change the PID switch 5.6 ON, as photo shown; and connect RS232 port to your host PC.

Step 2: Open DTU-RTU tool.exe (You can choose 64/32bit for PC Windows OS)
 
Software provides English display, press button as indicate change to English.
1. Change Comport to right port no. (In demo is COM5).
2. Choose Baud Rate to “9600”.
3. Leave other buttons do not change or set, then press [Open COM] button.
4. Make sure SIM card in holder and powered on MRR-M.
 
The left screen window show welcome info as follow, mean GPRS router is connect to PC and prepare configuration.

Notes: MRR-M default set to automatic connect remote server, please do all the configuration in 30sec, that parameter setting will invalid after screen window show "CONNECTED". That only needs to repower the MRR-M.

Step 3: Set APN (Access Point Name) info
 
Please contact your local mobile network service providers for confirm the APN account and password, in demo use china mobile.
 
After enter right APN info, press button [Set] to confirm setting, user can press button [Get] to check presetting in left screen window.

Step 4: Set destination IP to remote server
 
MRR-M support URL or IP setting, send data to max 6 different remote IP (named from A to F).

In demo destination IP is BLUE JAY cloud server IP (60.191.205.75), Blue Jay Technology provide 6 month free testing account for every client that purchase MRR-E and MRR-M, you can find your own Server Port and account info in products package, or contact your sale manager. Want know how to use Cloud Server? How to use Blue Jay Cloud Server.
 
After enter right Server info, press button [Set] to confirm setting, user can press button [Get] to check presetting in left screen window.

Notes: Please do not change other parameter in GPRS router, if you want advanced function, please contact Blue Jay Tech Team: This email address is being protected from spambots. You need JavaScript enabled to view it.
 
After set the GPRS configuration, powered off the MRR-M, disconnect RS232 adapter and recovery PID switch 1.4 ON, as following photo, then repower the MRR-M it will send data to the destination IP.