Dry-type transformers are the go-to choice for data centers, commercial towers, tunnels and metros where oil-filled units cannot be used. Unlike oil transformers, they give few obvious warning signs; insulation erodes quietly via partial discharge until flashover strikes. PD often appears months or years ahead of failure. While an HFCT on the ground wire can detect discharge fast, locating the exact faulty phase remains tough. Wrong guesses waste labor and take good transformers out of service. This article explains how to pinpoint PD location.
Fast PD Localization for Transformers Using 3PARD the PD signal picked up by the HFCT PD sensor is analyzed and roughly located with a three-phase amplitude relation diagram (3PARD).
3PARD is a 3D plot: the amplitudes measured on phases A, B, and C become the three axes, and every captured pulse becomes a single dot. Because one source always keeps the same amplitude ratio across the three phases, its dots do not scatter-they gather into a cluster.
Where the cluster sits tells you where the source is. A cluster near the A axis means the discharge is on phase A; a cluster on the plane between the A and B axes means it sits between phases A and B.
No waveform-by-waveform comparison needed-the location reads off the plot at a glance.
To verify the test results, three types of typical discharge defects were intentionally introduced into a 12 kV dry-type transformer.
Defect 1: Phase C discharge
Use a wire to create a discharge between the high-voltage terminal of Phase C and the insulating surface of Phase C.
Although phase C is the source of the fault, significant discharge signals were also detected in phases A and B, indicating that these signals propagated to the other phases via coupling through the windings.
The discharge signal is strongest in phase C, followed by phase A, with phase B being the weakest.
The PRPD pattern for phase A is similar in shape to that of phase C, but with opposite polarity.
The plot showing the amplitude relationships across the three phases clearly indicates that the discharge is primarily concentrated in phase C.
Defect 2 · Discharge between Phase A and Phase B
A conductor is resting between the high-voltage terminal of Phase A and the insulating surface of Phase B.
The discharge originates in phase A and couples (crosstalks) into phase B. The discharge signal is strongest in phase A, followed by phase B, and is weakest in phase C.
The PRPD patterns for both phase A and phase B exhibit characteristics typical of corona discharge.
A signal was also detected in phase C, but its PRPD pattern shows an opposite polarity compared to the other two phases.
The 3PARD plot indicates that the discharge occurs between phase A and phase B.
Defect 3 · Discharge between Phase C and Phase B
Similar to Defect 2, a conductor is connected between the high-voltage terminal of Phase C and the insulating surface of Phase B.
The discharge originates in phase C and couples (crosstalks) into phase B. The discharge signal is strongest in phase C, followed by phase B, and is weakest in phase A.
The PRPD patterns for phases C and B are similar in shape, though the polarity in phase B is reversed.
Although the signal amplitude detected in phase A is very low, the shape of its PRPD pattern remains similar to those of the other phases.
The 3PARD plot confirms that the discharge occurs between phase C and phase B.
The conclusions from all three cases are consistent: 3PARD can quickly and intuitively determine which phase a partial discharge originates from—whether it is a single-phase-to-ground fault or an interphase discharge—providing a clear indication in each instance.
Dry-type cast-resin transformers earn their place in buildings, tunnels, and other fire-sensitive sites by removing the oil — but the insulation that replaces it still degrades, and partial discharge is the earliest evidence that it is.
This article covers what that means in practice: the three discharge types that matter, how an HFCT clamped to the grounding conductor captures them without taking the unit out of service, and how a 3PARD plot turns three channels of amplitude data into a fast, readable answer to the only question a maintenance team really asks – which phase is failing. Tests on a 12 kV unit with three seeded defects confirm the method holds for both phase-to-ground and phase-to-phase sources, and that cross-coupled signals on healthy phases have to be read, not dismissed.